By Miami Global Solutions · Updated · 8 min read
Three programs, one paper trail
Florida's milestone inspection law (section 553.899) and structural integrity reserve study (SIRS) requirement (section 718.112(2)(g)) apply statewide. Miami-Dade also has its long-standing building recertification program under section 8-11(f) of the county code. According to Miami-Dade County, its recertification program combines the state's phase one and phase two inspections and meets or exceeds the state's milestone requirements. In Miami-Dade, only the recertification reports (structural and electrical) need to be filed.
Each program creates reports, notices, and deadlines, and all of them end up in the association's official records.
Milestone inspection basics
Condo and co-op buildings three or more habitable stories tall need a milestone inspection by December 31 of the year the building turns 30, and every 10 years after that. Local agencies may require it at 25 years where conditions such as proximity to salt water call for it. Phase one must be completed within 180 days after the association receives notice from the local agency. Phase two is required only if phase one finds substantial structural deterioration.
Miami-Dade recertification timing
Miami-Dade requires recertification at 30 years for most buildings, and at 25 years for condominium and cooperative buildings three stories or taller located within three miles of the coastline, then every 10 years. Owners have 90 days from the county's notice to submit the reports, prepared by a Florida-registered engineer or architect. Check the county's recertification portal for your building's status.
Structural integrity reserve studies
A residential condominium association must have a SIRS completed at least every 10 years for each building three habitable stories or higher. Associations that existed on or before July 1, 2022 had until December 31, 2025, or could complete the study together with a milestone inspection due by December 31, 2026, but no later than that date. For budgets adopted on or after December 31, 2024, owners can't vote to waive or reduce reserves for the components the SIRS covers.
Document deadlines to track
These are the records-side deadlines boards most often miss:
- Within 14 days of the local agency's notice that a milestone inspection is required, notify owners and give them the completion deadline
- Within 45 days of receiving a milestone inspection report, send the inspector's summary to every owner, post the summary in a conspicuous place on the property, and publish the full report and summary on the association website if one is required
- Within 45 days of receiving a SIRS, send each owner a copy or a notice that it's available, and file a completion statement with the state's Division of Condominiums
- Keep inspection reports for 15 years after receipt and each SIRS for at least 15 years after completion
- Post inspection reports, the most recent SIRS, and building permits for planned or ongoing repairs on the association website if one is required
Organizing inspection records
Keep one file per building containing every inspection report and summary, the engineer's correspondence, proof that owners were notified, the current SIRS, and the permits and contracts for the resulting repairs. If a phase two report identifies substantial structural deterioration, the local ordinance sets a repair timeline, and repairs must begin within 365 days. A clear file makes that timeline easy to show.
How Miami Global Solutions helps
We organize inspection, SIRS, and permit records by building, track notice and distribution deadlines, and keep required documents ready for the owner website. We don't perform inspections, provide engineering opinions, or determine compliance. Those stay with your licensed engineer or architect, manager, and attorney.
This guide is general information, not legal advice. Statutes change, and how they apply depends on your association's documents and circumstances. Confirm requirements with your association's attorney.